Completed Structural Work As All Columns, Beams Joist For Laying The Flooring On Second Floor. Coming From The Ground To Fourth Floor By Rehabilitant The Structure From The Ground Level To The Fourth Floor . [Carrying The Structural Repair Work Of Old Heritage Building].
