Constructing New Boundary Wall In Stone And Fixing The M.S Angles Then Laying The BOB Wire On The Angles
Leveling Of Rough Land In Murum Soil With JCB Machines And Rollers To Level The Surface of Land.
Constructing New Water Well By Doing Excavation On Land And Building The Stone Wall Around The Well Up to The 3 Feet Height From The Ground Level.
